Wärtsilä will power a 40 MW/80 MWh energy storage project involving a leading renewable energy company in the US. The contract signed with RWE Renewables deals with the supply of a 40 MW/80 MWh DC-coupled solar plus storage system to the Hickory Park Solar project in Georgia.

More into details, the Wärtsilä system will enable a subsidiary of RWE Renewables, Hickory Park Solar, to sell nearly 200 MW of generation from the solar PV panels to Georgia Power Company.

Wärtsilä’s GEMS Digital Energy Platform will control the entire hybrid plant, comprising close to 200 MW solar PV and a 80 MWh GridSolv Quantum energy storage system. GEMS monitors, synchronises, and optimises generation assets at increments of 100 milliseconds, using machine learning and historic and real-time data analytics to calibrate the type of generation needed at any specific time, all under a single portfolio. 

Wärtsilä energy storage, with IntelliBidder and GridSolv Quantum

In addition, Wärtsilä’s IntelliBidder auto-bidding solution allows Hickory Park Solar to provide Georgia Power a day-ahead firming solar plus storage profile, which will improve the predictability of the intermittent generation. The cloud-based IntelliBidder uses machine learning and algorithms based on automated and forecasted data, taking real-time trading and combining it with a smart control platform that provides value-based asset management and portfolio optimisation

The Hickory Park Solar project will also see the deployment of GridSolv Quantum, Wärtsilä’s next-generation energy storage system (ESS). The project is currently designed with CATL batteries. With functionality a key feature, GridSolv Quantum is a fully integrated modular and compact solution that enables a holistic and intuitive ESS, while maintaining a minimalist design to ease the scope and complexity of deployment activities. The solution also delivers the lowest lifecycle costs and the smallest system footprint.

Delivery scheduled for September 2021

«For us, this is a milestone project of renewable integration involving solar PV plus energy storage, with the batteries being charged entirely from the solar system. It is one of the very few projects globally on this scale using DC-coupling. The flexibility and broad capabilities of the GEMS software enable effective and efficient control over the entire system, which is essential in this 80 MWh project with the GridSolv Quantum ESS», commented Andy Tang, Vice President, Energy Storage and Optimisation, Wärtsilä Energy. 

Delivery of the Wärtsilä equipment is scheduled for September 2021, and the plant is expected to commence commercial operations in November of that year.

Highlights

FPT Industrial: let’s go, XC13

The XC13 surely sounds agnostic in FPT Industrial’s unofficial nomenclature; it comes, indeed, with a tripartite certification: Euro 6E (winking an eye at the upcoming Euro 7), methane gas and also biofuel, with a link to hydrogen. Andrea Abbà, FPT’s product marketing manager, told us about dialogui...

Related articles

Data Centre Nation Milan 2024

Data Center Nation Milan is regarded as the premier event for the Data Center industry in Italy. We saw Isotta Fraschini Motori, Cummins and Rolls-Royce Power Systems